Whirlpool Resources
Revisit this page for the most up-to-date Whirlpool account resources and policies.
Standard Operating Procedures
SOPs are policies and expectations set forth and apply to all Allegro locations for consistency a...
Routing SOP
Overview The routing process is a critical step in supporting the Whirlpool account. It’s throug...
Inventory Control SOP
Overview Inventory Control is a critical part of running an efficient, accurate, and profitable ...
LDC SOP
Start of Day Procedures: Setting the day up for success requires focus and timeliness. The LDC ...
How to and Training Documents
These documents should be referenced for in-the-moment support.
How to Route
NOTE – You will always route two days ahead (with the exception of holidays) – Monday for Wednesd...
How to setup Route Planner columns
Setting up Route Planner with the proper columns with assist with presenting the necessary inform...
How to submit a CUA (Condition Upon Arrival)
When a product is found to be damaged on an inbound product shuttle, a CUA must be filled out by ...
How to submit a shuttle shortage or overage
All inbound product shuttle shortages and overages must be reported following the below process b...
How to product handling, trailer and dolly inspection, and trailer loading
LDC must adhere to the processes outlined for product handling to prevent unnecessary damage. Thi...
How to troubleshoot Whirlpool systems
Having trouble with a Whirlpool system? Start here: